AssetBlock Modular Training Systems

One steel block. Any industrial asset.

AssetBlock builds an industrial training ground from one standard steel block, the UB-2400.

  • Patent applications filed
  • Priority date 8 August 2026

Eight cartridge families. One shell.

A cartridge slides into the shell on internal rails and locks. The cartridge sets the scenario. The shell stays the same.

  • Tank
  • Vessel
  • Pump
  • Exchanger
  • Valves
  • Pipe rack

Corner-locked, stackable, freight-ready.

ISO 1161 corner fittings, cones and shear pins let the blocks align, lock, stack and travel as ordinary freight.

  • 2400 x 1200 x 1200 mm
  • Interfaces to 2 mm

A process plant from one part.

Eleven identical blocks form the Config A process plant. A new scenario is a new cartridge, not a new prop.

  • 11 drawn layouts
  • Licence ready
UB-2400 universal block shell, galvanised steel frame

The system

The universal block

Every AssetBlock training ground is built from one part. The shell never changes. The cartridge inside it sets the scenario. The layout of the blocks sets the asset.

Designation
UB-2400 universal block
External size
2400 x 1200 x 1200 mm nominal (7 ft 10 in x 3 ft 11 in x 3 ft 11 in)
Structure
S355JR structural steel or equivalent (comparable to ASTM A572 Grade 50)
Finish
Hot-dip galvanised, or an industrial coating chosen by the licensee's engineer
Corners
ISO 1161 corner fittings, joined block to block by bridge fittings
Alignment
Stacking cones and receivers locate each block. Hardened shear pins lock it.
Interface tolerance
Plus or minus 2 mm (0.08 in). Two blocks butt at zero gap.
Cartridge mounting
Internal guide rails, locating pins and a positive lock with a visible indicator
Weight
823 to 955 kg (1,815 to 2,105 lb) per block with its cartridge fitted
Handling
Four top-corner lifting lugs and forklift pockets from either side
Engineering
Final structural sizing is verified by the licensee's engineer before fabrication

Scenarios

Cartridge families

Eight cartridge families slide into the same shell. Each one is modelled in 3D. The cartridge types used in the Config A process plant are detailed in its build drawing set.

Configurations

Eleven configurations

Process plant training ground built from eleven AssetBlock units
Process plant layout: eleven identical blocks.
ConfigurationDrawing statusTraining focus
Horizontal tankPatent drawingHorizontal tank fires, flange and shell cooling
Vertical tankPatent drawingVertical vessel and tank wall scenarios
Pipe rackPatent drawingElevated line fires and rack cooling
Pump skidPatent drawingSeal and flange fires at grade
Heat exchangerPatent drawingProcess unit and flange scenarios
Valve manifoldPatent drawingIsolation, leak control and shut-down drills
Modular process plant (Config A)Full build package, 11 blocksUnit fires, vessel, exchanger and pump scenarios
Tank farmPatent drawingTank, rim seal and bund scenarios with foam and water
Vehicle and road tankerPatent drawingTransport incident and loading bay scenarios
Confined spacePatent drawingEntry, search and rescue from vessels
Marine and offshorePatent drawingDeck, module and engine room scenarios
Elevation of a row of AssetBlock units

For manufacturers

Licensee value

  1. A finished product line

    The design work is done. A licensee goes from drawings to a first build without a development programme.

  2. One part in production

    Every block is the same block. Production runs are repeat runs, which keeps cost and quality steady.

  3. Revenue after the first sale

    Customers add cartridges and blocks as budgets allow. Each new scenario is a new order.

  4. Fits existing fire systems

    The gas-fire cartridge carries the licensee's own burners and controls. AssetBlock is the structure around them.

  5. Freight, not a site build

    Blocks ship on standard trucks and set down by crane. Less civil work at the customer's site.

  6. Every budget level

    A training centre starts with one block and grows to a full plant on the same standard.

Safety concept

The valves a trainee operates are dummy valves. They have no connection to the gas. Live gas is controlled only at the external manifold, in an instructor zone with an emergency shut-off. Every hose and coupling is leak-tested before ignition. Each burn has an exclusion zone, a marked flame direction and a post-burn inspection. Fire service design, controls and certification follow the licensee's own systems, NFPA 1402, NFPA 1403 and the local authority.

Users

Oil, gas and petrochemical fire brigades. Refinery, port, airport fuel-farm and utility response teams. Fire academies, colleges and military training centres. Municipal departments with industrial risk. Offshore and marine training providers.

For live-fire simulator manufacturers

Fit with an existing simulator range

AssetBlock is built to sit beside a proven simulator range, not to replace it. The licensee keeps its gas systems, controls and NFPA 1402 practice. AssetBlock adds an industrial line on top.

  1. Industrial range

    Structural towers, flashover units and outdoor props already cover municipal training. AssetBlock adds the process plant: vessels, exchangers, pumps, valve manifolds, pipe racks and tank farms.

  2. Existing gas systems

    Gas is fed from an external manifold with an emergency shut-off. The licensee's own propane or natural-gas train, PLC, flame monitoring and interlocks connect there. The fire technology stays the licensee's own.

  3. Pre-engineered structure

    The block, the cartridges and eleven configurations are already drawn. A new industrial prop becomes a repeat build. The licensee's engineer verifies the final sizing once.

  4. Container practice

    ISO 1161 corner fittings, lifting lugs, forklift pockets and standard trucks. The same handling as container-based training buildings.

  5. Multi-use by design

    One shell takes any cartridge. One purchase covers many scenarios, and a scenario change is a cartridge swap.

  6. Catalogue sales

    Fixed blocks and cartridges give fixed part numbers and fixed prices. The line suits catalogue and cooperative-contract buying.

  7. Service revenue

    Every block follows the same inspection routine. Annual inspections, cartridge additions and upgrades repeat across every customer.

Ready to build

Design package

Patent applications filed. Priority date 8 August 2026.

Commercial

Licence models

Route to licence

  1. 01

    Overview

    This site and the visual overview PDF. Non-confidential.

  2. 02

    Video call

    Twenty minutes. The 3D model and the animations walked through on screen.

  3. 03

    Mutual NCNDA

    A short mutual non-circumvention and non-disclosure agreement, signed by both parties.

  4. 04

    Data room

    Drawings, specification and the Config A build package, released within two working days of signature.

  5. 05

    Pilot

    One block plus two or three cartridges, built by the licensee, with a live demonstration.

  6. 06

    Licence

    Manufacturing or site licence, by field and territory.

Origin

Designer background

AssetBlock was designed by a fire and rescue instructor with more than 25 years in emergency response instruction in Trinidad and Tobago and the United Arab Emirates, trained to NFPA and TEEX programmes. The design answers one problem seen on every industrial training ground: each new scenario needed a new prop.

Detail

Questions and answers

Is AssetBlock a concept or a finished design?

A complete design package: 30 patent drawing sheets, a 56-page specification, a full build package for the 11-block Config A process plant, a fixture design package, a 3D model and 17 rendered films. No block has been built yet. The first physical block is the pilot, built with the first licensee. Final structural sizing is verified by the licensee's engineer.

Does AssetBlock work with existing burner and control systems?

Yes. Gas enters through an external manifold in an instructor zone, with a regulator, gauge, emergency shut-off and purge point. Certified hoses with locking quick couplings run to a burner on a mount plate and heat shield. The licensee's own fuel train, PLC and interlocks sit at the manifold. AssetBlock supplies the structure, the scenario and the layout.

Which fire training standards apply?

The licensee builds and inspects each live-fire prop to NFPA 1402, as with its current props. Live-fire evolutions follow NFPA 1403 and the local authority having jurisdiction. The specification names the steel grade, fasteners and finish for the block.

How are the blocks moved and installed?

Each block lifts on four top-corner lifting lugs or by forklift from either side. Blocks travel by standard road freight and set down on a prepared slab. Cones and receivers align the blocks, shear pins lock them, and bridge fittings join the ISO 1161 corner fittings.

Can a training ground change after it is built?

Yes. Blocks rearrange into a new layout, and cartridges swap to change the scenario. The investment stays in use as training needs change.

Is the licence exclusive?

Either. A manufacturing licence is granted by field and by territory, exclusive or non-exclusive, by agreement.

Who owns the intellectual property?

The designer is the sole owner of the AssetBlock design, the drawings and the patent applications, with full authority to license or assign them.

What is the patent status?

Patent pending. International application PCT/IB2026/058444 and a Swiss application were filed on 8 August 2026, the priority date. The design package is also protected as know-how and by copyright in the drawings.

What do the licence terms look like?

Terms are set by field and territory, and are discussed on the video call. Full commercial terms are shared after the NCNDA is signed.

Is an outright purchase of the rights possible?

Yes. Assignment of the full rights is open for discussion alongside the licence options.

How fast can a pilot start?

The Config A build package is ready for fabricator quotation. A pilot block and two or three cartridges can go to fabrication once the pilot scope is agreed and the licensee's engineer has verified the structural sizing.

Next step

A 20-minute video call walks through the 3D model and the animations. The mutual NCNDA opens the drawings, specification and build package.

kirthandreregis@gmail.com